So far we have :
-made outdoor fire pit
-cut back the willows and bushes
-fixed a TON of holes in the walls
-put up new wall sconces in living room
-lights/paint in dining room
-new front door and storm door
-new kitchen cabinet hardware
-new kitchen paint
-new kitchen lighting
-I've got the new kitchen island top in the garage, I've just got to do some finishing work on it and install it
-main floor half bath vanity, paint, sink, floor, light, hardware, etc... (still working on it)
-painted one of the spare bedrooms
-new light fixtures in all spare bedrooms
-put up cabinets above washer/dryer

Pics:

Pic before willows and bushes/shrubs cut back:

Main floor half bath, still need to install white toilet and mirror then it's done

Kitchen after paint, hardware, bosch dishwasher, new sink, new faucet, new light above table, still need to finish island top



Spare bedroom upstairs, new paint, new light (not mounted in this picture)

Future plans for the basement

Future plans for the whole house include remodeling damn near every room in the house one at a time.

As far as outside goes, I'm going to put a walkway from the front steps to the driveway next summer, put up new gutters next summer, plant trees every 4-5 feet on the property line around the sides and back of the house, rip down the deck and rebuild it attached to the house at the proper height (instead of a foot below the door), mulch landscaping around the whole house, apple tree in the yard....TONS OF PLANS...




Modified by darkelvis at 8:03 AM 12/4/2008